Demoulding equipment for mould inserts

Manual equipping of the mechanism directly from the extruder. The demoulding equipment automatically removes the mould insert and the tensioner, then feeds these parts to the back onto a conveyor belt.

The front insert and the injection-moulded part are transported from the mechanism to the right and are manually removed by the plant operator.

Automatic start of the process, depending on selection, after the placing of 1, 2 or 4 units.

Control:
S7 200

Production location:
Poland

2018-04-19T15:02:08+00:00